EG Meat
Carlisle Energy Solutions Case Studies & Testimonials
Learn How You Can Save 10-30% on Your Businesses' Energy Consumption.
Case Study & Testimonials
EG Meat In-Depth Case Study
Project consisted of installation of
The project consists of installing a Carlisle ECM Controller on each of the 1 Single Phase, 9 3 – Phase existing Evaporators and Retro – fit each of the evaporator’s existing motors with 3 MA14215 – 1/5Hp EC Motor – 23 P48013 – 480V, 1 – Ph, 1/3 Hp, Vari – Spd EC Motor – 5 P480150 – 480V, 3 – Ph, 1.5 Hp, Vari – Spd EC Motor – 1 ECM – I Controller – 9 ECM – III Controller.
Project Breakdown
$46,140.03 – Project cost
$9,533 – Rebate or Incentive Paid to customer
$36,607.03 – Net cost of Project
$10,592 – Monthly dollar savings at 7.5 cents per kWh
$29,742.39 – Annual dollar savings
$148,711.94 – 5yr dollar savings
127,104.2 – kWh’s REDUCED YEAR ONE
1.231 years Return on Investment ROI